Region: USA
Case Product: SR-S180
Collaborator: Raj Niroula
We briefly understood the situation with Raj Niroula and asked him to provide on-site pictures. Raj needs to make a 35ft x 25ft x 8 ft swimming pool enclosures. His requirements are very simple. The temperament and appearance of the product must match the style of his villa. It is worth mentioning that many engineering projects are similar to this size, and this size is not small. Once something goes wrong, it will cause serious losses. You can take a look at how Sunray successfully undertakes these projects.
Based on Raj's requirements and the local weather and climate environment in the United States, we recommended the WT-S180 electric swimming pool enclosures, introduced the characteristics of different shapes to Raj, and finally recommended the Independent circular arc. Because of its relatively large size, it would be difficult to open it manually and would not be in keeping with the emperor's temperament. Moreover, the noble texture brought by high-strength glass is unmatched by other materials. With such a large size, our product can easily handle winds below level 12 and snow 50 mm thick. You can also swim normally in it in winter.
After we confirm all the details, we charge a design fee, which will be deducted from the total order amount, and provided professional 3D drawing design to Raj for confirmation. After both parties confirmed that everything was correct, Raj immediately arranged the payment. It only took us Sunray 20 days to produce the automatic swimming pool cover and test that everything was normal before shipping it to Raj.
After receiving the swimming pool enclosure, Raj asked us how to install them. We sent the installation information to Raj. He realized that the installation was so simple, and he had been worried about this installation issue before purchasing. However, we still contacted the local dealer and arranged for a construction engineer to come to install it. The installation was completed in less than a day. It only took us two months to successfully implement this project